promptly. Where the IITE’s equipment is causing interference to existing equipment and the
interference cannot be resolved, IITE shall remove the source of interference immediately.
1.5 Standard Operating Procedures and Safety
(a) Regarding the installation, operation and maintenance of its Co-located equipment located in
the Co-location space, the IITE, being access seeker, must comply with AIRTEL Standard
Operating Procedures for Co-location space and any written instructions, which are provided to
IITE by AIRTEL.
(b) Regarding the physical access to the Co-location space, IITE shall comply with AIRTEL
Standard Physical Access Procedures as amended from time to time and any written instructions,
which are provided to IITE by AIRTEL.
(c) AIRTEL will get the Co-location space inspected by its representatives/staff to which access has
been approved for the installation, modification, replacement or addition of the equipment to verify
that the IITE, being access seeker, is undertaking the installation, modification, maintenance,
operation, replacement or addition of the equipment in accordance with the plan and such other
written instructions provided to the IITE.
(d) The IITE, being access seeker, shall consult with and obtain the consent of AIRTEL before
carrying out any hacking or drilling work on the floor, wall and ceiling slabs.
(e) No work shall be performed by the IITE, being access seeker, on any of equipment, facilities,
plant or Networks including, but not limited to earth bars and Power Distribution Points/boards of
AIRTEL.
(f) AIRTEL staff shall carry out all the facilitation/ provisioning of the IITE, being access seeker,
Co-location equipment to AIRTEL earth bars and Power Distribution Points/boards. Charges for
the work shall be borne by the IITE, as set out in AIRTEL published Co-location charges.
(g) Where, during the course of installation, operation, maintenance, replacement or repair of its
Co-located equipment the IITE, being access seeker, causes any damage to AIRTEL Co-location
site, plant, network, equipment or facilities, the IITE, being access seeker, must report the damage
immediately to AIRTEL. AIRTEL shall rectify the damage in any way it deems fit, the cost and
expense thereof shall be borne by the IITE, being access seeker.
1.6 Final Inspection
(a) Upon completion of the installation of the Co-location equipment in the Co- location space,
IITE, being access seeker, shall advise AIRTEL and request
AIRTEL to conduct a final inspection and confirm that the installation conforms to the approved
detailed installation plans.
(b) Where the final inspection reveals that the installation does not materially conform to the
approved detailed installation plans; AIRTEL shall notify the IITE, being access seeker. The