(LOCAL REPRODUCTION AUTHORIZED)
Veterans Benefits Administration Circular 26-17-19
Department of Veterans Affairs July 19, 2017
Washington, D.C. 20420
Clarification of Individual Water Supply System Testing
1. Purpose. This Circular provides clarification and guidance concerning testing of individual
(private) water supply systems for properties subject to Department of Veterans Affairs (VA) backed
loans.
2. Background. VA has long allowed properties with individual water supply systems to be eligible
for VA backed loans. However, potable water is a health and safety issue and as a part of VA Minimum
Property Requirements (MPR) require that water used for drinking, washing, and other uses inside the
home be safe for consumption. VA has always enforced requirements for safe potable water. This
Circular provides clarification of current policy along with updated information.
3. Action. The following items are effective as of the date of this Circular:
a. All testing must be performed by a disinterested third party. This includes the collection and
transport of the water sample collected at the water supply source. The sample may be collected and
tested by the local health authority, a commercial testing laboratory, a licensed sanitary engineer, or
other party that is acceptable to the local health authority. At no time will the Veteran or other interested
party collect and/or transport the sample.
b. For VA purposes, the test is valid for 90 days from the date certified by the local health authority.
After 90 days, another sample must be taken and test completed.
c. The water supply must meet the requirements established by the local health authority. If the local
health authority has not established specific requirements, then requirements established by the State
health authority will be used. In the case where there are no state requirements, then requirements
established by the Environmental Protection Agency (EPA) will be used. For further information please
see:
https://www.epa.gov/privatewells/private-drinking-water-well-programs-your-state
or
https://www.cdc.gov/healthywater/drinking/private/wells/testing.html.
4. Rescission: This rescission date is July 1, 2019.
By Direction of the Under Secretary for Benefits
Jeffrey F. London
Director, Loan Guaranty Service
Distribution: CO: RPC 2022
SS (26A1) FLD: VBAFS, 1 each (Reproduce and distribute based on RPC 2022)